Topic on Talk:Deconstruct
Jump to navigation
Jump to search
This is a permanent link to the first version of this post.
You can view later versions on the post history page.
Deconstructing a structure returns 75% of the original resource cost. Expect the cost to average out to 3.75 components over time, albeit every time it is rounded to either 3 or 4.